Bonanza Beverage
Las Vegas, Nevada |
- 28,620 SF Temperature Controlled Warehouse Expansion
- 1,200 SF Draught Cooler Expansion
- Conversion of Existing 64,000 SF Warehouse to Controlled Climate
- 2.1 Acre Truck Parking Lot
- Construction Completed in Two Phases
- Building Expansion/Cooler Expansion/CTW Conversion/New Docks Completed Simultaneously While Bonanza’s Operations Continued Un-interrupted
- Insulated Tilt-Up Concrete Panels (Thermal valve of R-18)
- Climate-Controlled Dock Vestibule/Pick Area
- Underpinned Existing Foundations and Tilt-Up Walls in Order to Construct New Docks
- Fully Hydraulic Dock Levelers
|
|